CPMGT 300 WEEK 3 Project Requirements/Risk/Cost

$9.99

CPMGT 300 WEEK 3 Project Requirements/Risk/Cost

Description

CPMGT 300 WEEK 3 Project Requirements/Risk/Cost

CPMGT 300 WEEK 3 Project Requirements/Risk/Cost

Prepare a project requirements matrix, a risk assessment matrix, and a cost breakdown for the Learning Team project selected in Week 2. Microsoft® Excel® can be used to prepare these documents.

Collect and evaluate the high-level project requirements.

Prepare a requirements matrix that includes:

  • Requirement
  • Phases of the project
  • Responsible party
  • Cost to complete
  • Duration to complete

Prepare a risk assessment matrix that includes:

  • Risk
  • Potential of risk occurring
  • Level of impact to the project
  • How risk can be mitigated

Prepare the project cost breakdown sheet.

Click the Assignment Files tab to submit the requirements matrix, the risk assessment matrix, and the cost breakdown sheet.

V031819

CPMGT 300 WEEK 3 Project Requirements/Risk/Cost