Prepare a project requirements matrix a risk assessment matrix and a cost breakdown for the Learning Team project selected in Week 2.  Microsoft® Excel can be used to prepare these documents.

Collect and evaluate the high-level project requirements.

Prepare a requirements matrix that includes:

  • Requirement
  • Phase of the Project
  • Responsible Party
  • Cost to complete
  • Duration to complete

Prepare a risk assessment matrix that includes:

  • Risk
  • Potential of risk occurring
  • Level of impact to the project
  • How risk can be mitigated

Prepare the project cost breakdown sheet.

Click the Assignment Files tab to submit the requirements matrix, the risk assessment matrix, and the cost breakdown sheet.